The Metro Regional Connector Project is a 1.9 mile light rail subway tunnel under construction in Downtown Los Angeles. It is designed to connect the existing Metro Rail A (Blue) and E (Expo) Lines at 7th Street/Metro Center Station to the existing L (Gold) Line and Union Station. Construction on the project started in 2014 and is now expected to … Read More
5-Month Full Closure of 6th Street Between Flower and Hope Starts June 3rd
The Los Angeles County Metropolitan Transit Authority (METRO) has informed FilmL.A. that there will be a five-month full closure of 6th street in downtown Los Angeles between Flower and Hope streets that will begin Saturday, June 3, 2017. During the closure, work crews will perform roadway removal, utility relocation and beam installation work required for the Regional Connector Project. The … Read More